CONTROL VALVE ASSEMBLY INSTALLATION


  1. INSTALL NO. 2 HEIGHT CONTROL VALVE SUB-ASSEMBLY


    1. Install the No. 2 height control valve with the 2 bolts.

      Torque:
      29 N*m  { 296 kgf*cm, 21 ft.*lbf }
  2. CONNECT HEIGHT CONTROL TUBE


    1. Connect the 3 height control tubes Click here.

      Tech Tips

      For the connection procedure of the tubes (type 1 and type 2), refer to Precaution of the Suspension Control System section.

    2. Connect the connector.

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  4. CHECK CONNECTION OF TUBE FOR AIR LEAK

    Click here