INSTALL GENERATOR ASSEMBLY
Install the generator bracket to the generator with the bolt.
Install the generator with the 2 bolts.
Install the generator bracket with the bolt.
Connect the wire harness clamp.
Install the wire harness with the 2 bolts.
Connect the generator connector to the generator.
Connect the generator wire with the nut.
Close the terminal cap.
INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
Install the heat insulator with the 3 bolts.
INSTALL WIRING HARNESS CLAMP BRACKET
Install the wiring harness clamp bracket with the bolt.
Attach the clamp.
INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
for Integrated Type:
Install the No. 2 idler pulley with the bolt.
for Separate Type:
Install the No. 2 idler pulley cover plate, No. 2 idler pulley and idler pulley cover plate with the bolt.
INSTALL FAN AND GENERATOR V BELT
| *1 | Vane Pump |
| *2 | Water Pump |
| *3 | No. 2 Idler |
| *4 | Generator |
| *5 | Cooler Compressor or Idler Pulley |
| *6 | No. 1 Idler |
| *7 | Crankshaft |
| *8 | V-ribbed Belt Tensioner |
Set the V belt onto every part.
While turning the belt tensioner counterclockwise, remove the pin.
Note
Make sure that the V belt is properly installed to each pulley.
Check that the belt fits properly in the ribbed grooves.
Tech Tips
Make sure to check by hand that the belt has not slipped out of the grooves on the bottom of the pulley.
INSTALL V-BANK COVER
| *1 | Pin |
| *2 | Hook |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
INSTALL BATTERY TRAY
INSTALL BATTERY
INSTALL BATTERY HOLD DOWN CLAMP
Install the battery hold down clamp with the 2 nuts.
CONNECT CABLE TO POSITIVE BATTERY TERMINAL
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.