DESCRIPTION
When the ignition switch is turned to ON, battery voltage is applied to terminal IG2 of the TCM.
WIRING DIAGRAM
Refer to DTC P0560 Click here.
INSPECTION PROCEDURE
Note
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
CHECK TCM (TCM - BODY GROUND)
| *a | Rear view of wire harness connector (to TCM) |
Disconnect the G69 TCM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - TCM)
Disconnect the No. 1 integration relay 1A connector.
Disconnect the G70 TCM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | Proceed to |
|---|---|
| OK (w/ DPF) | A |
| OK (w/o DPF) | B |
| NG | C |
| B |
|
GO TO ECD SYSTEM (ECM POWER SOURCE CIRCUIT) Click here |
| C |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| A |
|
GO TO ECD SYSTEM (ECM POWER SOURCE CIRCUIT) Click here