Click here

STARTER INSTALLATION

Click here
Click here Click here
  1. Click here

    INSTALL STARTER ASSEMBLY


    1. Install the starter assembly with the 2 bolts and nut.

      68 N*m 693 kgf*cm 50 ft.*lbf
    2. Connect the starter wire with the nut.

      9.8 N*m 100 kgf*cm 87 in.*lbf
    3. Install the terminal cap.

    4. Connect the starter connector.

  2. Click here

    CONNECT CLUTCH FLEXIBLE HOSE BRACKET


    1. Connect the clutch flexible hose bracket with the bolt.

      72 N*m 730 kgf*cm 53 ft.*lbf
  3. Click here

    CONNECT CLUTCH RELEASE CYLINDER ASSEMBLY


    1. Connect the release cylinder with the 2 bolts.

      12 N*m 120 kgf*cm 9 ft.*lbf
  4. Click here

    INSTALL REAR ENGINE UNDER COVER ASSEMBLY


    1. Install the rear engine under cover with the 4 bolts.

      29 N*m 296 kgf*cm 21 ft.*lbf
  5. Click here

    CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).