AIR SWITCHING VALVE (for Bank 2) REMOVAL


  1. REMOVE PURGE VSV


    1. Remove the purge VSV Click here.

  2. REMOVE NO. 2 AIR TUBE


    1. A01DPUL

      Remove the 2 bolts, 2 nuts and No. 2 air tube.

    2. Remove the 2 gaskets from the No. 2 air tube.

      Note

      Be careful not to damage the installation surface of the gaskets.

  3. REMOVE NO. 2 EMISSION CONTROL VALVE SET


    1. A01DS89

      Disconnect the No. 2 emission control valve set connector.

    2. Disconnect the No. 3 air hose.

    3. A01DS1C

      Remove the 3 nuts and No. 2 emission control valve set.