DESCRIPTION
The navigation ECU sub-assembly receives a reverse signal from the park/neutral position switch assembly.
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
CHECK HARNESS AND CONNECTOR (REVERSE SIGNAL)
Disconnect the navigation ECU sub-assembly connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
CHECK HARNESS AND CONNECTOR (NAVIGATION ECU SUB-ASSEMBLY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY) Click here |
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here
CHECK HARNESS AND CONNECTOR (NAVIGATION ECU SUB-ASSEMBLY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY)
Disconnect the navigation ECU sub-assembly connector.
Disconnect the park/neutral position switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - BATTERY)
Disconnect the park/neutral position switch assembly connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPLACE PARK/NEUTRAL POSITION SWITCH ASSEMBLY Click here