INSTALL DIESEL THROTTLE BODY
Place a new gasket and the diesel throttle body on the intake manifold.
Connect the throttle control motor connector.
Connect the throttle open switch connector.
INSTALL INTAKE FLANGE
Install a new gasket and the intake flange with the 3 nuts.
Connect the PCV hose.
Connect the manifold absolute pressure sensor connector.
Connect the heater water hose with the bolt.
INSTALL INTAKE PIPE
Install the intake pipe with the 2 bolts and tighten the hose clamp.
INSTALL RESONATOR WITH AIR CLEANER CAP SUB-ASSEMBLY
Insert the hinge part of the air cleaner cap and hose into the air cleaner case, and then attach the 4 hook clamps.
Connect the air cleaner cap sub-assembly with the clamp.
Attach the wire harness clamp.
Connect the 2 clamps and connector.