EXHAUST PIPE INSTALLATION


  1. INSTALL HEATED OXYGEN SENSOR (for Bank 2)


    1. A01HORDE01
      Text in Illustration
      *a

      Fulcrum Length

      30 mm (1.18 in.)

      *b

      Fulcrum Length

      180 mm (7.09 in.)

      Using SST, install the heated oxygen sensor to the front exhaust pipe assembly.

      SST
      09224-00010
      Torque:
      without SST
      44 N*m  { 449 kgf*cm, 33 ft.*lbf }
      with SST
      40 N*m  { 408 kgf*cm, 30 ft.*lbf }

      Note


      • The "with SST" torque value is effective when using SST with a fulcrum length of 30 mm (1.18 in.) and a torque wrench with a fulcrum length of 180 mm (7.09 in.) Click here.

      • The "with SST" torque value is effective when SST is parallel to the torque wrench.

  2. INSTALL HEATED OXYGEN SENSOR (for Bank 1)


    1. A01HPVRE01
      Text in Illustration
      *a

      Fulcrum Length

      30 mm (1.18 in.)

      *b

      Fulcrum Length

      180 mm (7.09 in.)

      Using SST, install the heated oxygen sensor to the center exhaust pipe assembly.

      SST
      09224-00010
      Torque:
      without SST
      44 N*m  { 449 kgf*cm, 33 ft.*lbf }
      with SST
      40 N*m  { 408 kgf*cm, 30 ft.*lbf }

      Note


      • The "with SST" torque value is effective when using SST with a fulcrum length of 30 mm (1.18 in.) and a torque wrench with a fulcrum length of 180 mm (7.09 in.) Click here.

      • The "with SST" torque value is effective when SST is parallel to the torque wrench.

  3. INSTALL FRONT EXHAUST PIPE ASSEMBLY


    1. Install 2 new gaskets to the front exhaust pipe assembly.

    2. Connect the front exhaust pipe assembly to the No. 1 exhaust pipe support bracket (for Rear Side).

    3. Install the front exhaust pipe assembly with the 2 bolts and 2 nuts.

      Torque:
      55 N*m  { 561 kgf*cm, 40 ft.*lbf }
    4. Connect the 2 heated oxygen sensor connectors.

    5. Install the 2 wire harnesses to the clamp.

  4. INSTALL NO. 1 EXHAUST PIPE SUPPORT BRACKET (for Front Side)


    1. Install the No. 1 exhaust pipe support bracket with the 2 nuts (for Front Side).

      Torque:
      33 N*m  { 337 kgf*cm, 24 ft.*lbf }
  5. INSTALL ENGINE UNDER COVER RH

  6. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH

  7. INSTALL CENTER EXHAUST PIPE ASSEMBLY


    1. Install a new gasket to the front exhaust pipe assembly.

    2. Connect the center exhaust pipe assembly to the exhaust pipe supports.

    3. Install the center exhaust pipe assembly with the 2 bolts and 2 nuts.

      Torque:
      49 N*m  { 500 kgf*cm, 36 ft.*lbf }
  8. INSTALL EXHAUST PIPE DAMPER


    1. Install the exhaust pipe damper with the 2 bolts.

      Torque:
      19 N*m  { 194 kgf*cm, 14 ft.*lbf }
  9. INSTALL TAIL EXHAUST PIPE ASSEMBLY


    1. Install a new gasket to the center exhaust pipe assembly.

    2. Connect the tail exhaust pipe assembly to the 3 exhaust pipe supports.

    3. Install the tail exhaust pipe assembly with the 2 nuts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
  10. INSTALL TAIL EXHAUST PIPE ASSEMBLY LH


    1. Install a new gasket to the center exhaust pipe assembly.

    2. Connect the tail exhaust pipe assembly LH to the 2 exhaust pipe supports.

    3. Install the tail exhaust pipe assembly LH with the 2 nuts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
  11. INSPECT FOR EXHAUST GAS LEAK