КЛАПАН ПЕРЕКЛЮЧЕНИЯ ПОДАЧИ ВОЗДУХА (для ряда 2) УСТАНОВКА

Click here
Click here
  1. Click here

    INSTALL AIR SWITCHING VALVE ASSEMBLY


    1. A01EPXKE01

      Install a new gasket and the air switching valve with the 3 bolts.

      24 N*m 245 kgf*cm 18 ft.*lbf
      Table 1. Text in Illustration
      *1 Air Switching Valve
      *2 Claw
      *3 No. 3 Air Tube
      Note:

      Make sure the claws of the gasket are not caught between the air switching valve and No. 3 air tube.

    2. Install the 2 bolts.

      10 N*m 102 kgf*cm 7 ft.*lbf
    3. Attach the wire harness clamp and connect the air switching valve connector.

  2. Click here

    CONNECT NO. 1 AIR INJECTION SYSTEM HOSE


    1. A01EPIKE01

      Align the paint mark with the projection and connect the No. 1 air injection system hose.

      Table 2. Text in Illustration
      *1 Protrusion
      *2 Paint Mark
      Tip:

      Make sure the direction of the hose clamp is as shown in the illustration.

  3. Click here

    CONNECT NO. 3 PCV HOSE


    1. Connect the No. 3 PCV hose.

  4. Click here

    INSTALL AIR CLEANER CAP AND HOSE


    1. Install the air cleaner cap and hose, and then tighten the hose clamp.

      2.5 N*m 25 kgf*cm 22 in.*lbf
    2. Attach the 4 clamps.

    3. Connect the mass air flow meter connector and attach the clamp.

    4. Connect the No. 2 PCV hose and No. 1 air hose.

  5. Click here

    INSTALL V-BANK COVER SUB-ASSEMBLY


    1. A01ER0YE01

      Совместите 2 крюка крышки V-образного двигателя с кронштейном. Затем совместите 3 уплотнительных шайбы декоративной крышки V-образного двигателя с 3 штифтами и нажмите на декоративную крышку V-образного двигателя, чтобы закрепить штифты.

      Table 3. Обозначения на рисунке
      *1 Уплотнительная шайба
      *2 Штифт
      *3 Крюк
      *4 Кронштейн
  6. Click here

    INSTALL ENGINE ROOM SIDE COVER RH


    1. Установите правую боковую крышку моторного отсека и закрепите ее 7 фиксаторами.