INSTALL NOISE FILTER
for Bank 2:
Install the noise filter to the cylinder head cover with the bolt.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
for Bank 1:
Install the noise filter to the cylinder head cover with the bolt.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
INSTALL IGNITION COIL ASSEMBLY
Install the 8 ignition coils with the 8 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
INSTALL NO. 11 WATER BY-PASS HOSE
Install the No. 11 water by-pass hose.
| *1 | Paint Mark |
| *a | Rear |
| *b | Front |
When connecting the hose, make sure the paint marks and clips are as shown in the illustration.
The direction of the hose clamp is indicated in the illustration.
INSTALL ENGINE WIRE
Attach the 3 wire harness clamps to install the engine wire.
Connect the 4 knock sensor connectors.
Install the bolt.
| 8.0 N*m | 82 kgf*cm | 71 in.*lbf |
INSTALL NO. 1 ENGINE COVER
INSTALL NO. 2 ENGINE COVER
INSTALL SEPARATOR CASE
Установите корпус сепаратора и закрепите его 4 болтами.
| 10 Н*м | 102 кгс*см | 7 фунт-сила-футов |
INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY
Install the No. 1 idler pulley with the bolt.
| 43 N*m | 438 kgf*cm | 32 ft.*lbf |
INSTALL WATER PUMP PULLEY
Temporarily install the water pump pulley with the 4 bolts.
Using SST, hold the water pump pulley and tighten the 4 bolts.
| 09960-10010 | 09962-01000 | 09963-01000 |
| 21 N*m | 214 kgf*cm | 15 ft.*lbf |
INSTALL NO. 1 WATER BY-PASS HOSE
INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY
Connect the 4 hoses.
Install the water by-pass pipe with the 2 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
INSTALL NO. 3 ENGINE COVER
Установите крышку двигателя № 3.
|
Передняя сторона двигателя |
Расположите крышку № 3 двигателя так, чтобы стрелка была направлена в сторону передней части двигателя, после чего установите ее.
INSTALL NO. 4 ENGINE COVER
Установите крышку двигателя № 4.
|
Передняя сторона двигателя |
Расположите крышку № 4 двигателя так, чтобы стрелка была направлена в сторону передней части двигателя, после чего установите ее.
INSTALL NO. 2 FUEL DELIVERY PIPE SUB-ASSEMBLY
Install the 2 delivery pipe spacers and 4 insulators to the cylinder head LH.
Install the delivery pipe together with the injectors to the cylinder head LH.
Install the 2 bolts.
| 21 N*m | 214 kgf*cm | 15 ft.*lbf |
Make sure that the part of the injector labeled B is between the parts of the delivery pipe labeled A.
| *1 | Fuel Delivery Pipe |
| *2 | Fuel Injector |
| *a | CORRECT |
| *b | INCORRECT |
Connect the No. 7 wire harness connector.
INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
Install the 2 delivery pipe spacers and 4 insulators to the cylinder head RH.
Install the delivery pipe together with the injectors to the cylinder head RH.
Install the 2 bolts.
| 21 N*m | 214 kgf*cm | 15 ft.*lbf |
Make sure that the part of the injector labeled B is between the parts of the delivery pipe labeled A.
| *1 | Fuel Delivery Pipe |
| *2 | Fuel Injector |
| *a | CORRECT |
| *b | INCORRECT |
Connect the No. 6 wire harness connector.
INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH
Install the front No. 1 engine mounting bracket LH with the 4 bolts.
| 35 N*m | 357 kgf*cm | 26 ft.*lbf |
INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH
Install the front No. 1 engine mounting bracket RH with the 4 bolts.
| 35 N*m | 357 kgf*cm | 26 ft.*lbf |
INSTALL NO. 1 EGR PIPE BRACKET
Install the No. 1 EGR pipe bracket with the 3 bolts.
| 21 N*m | 214 kgf*cm | 15 ft.*lbf |
INSTALL NO. 1 WATER OUTLET PIPE
Install the No. 1 water outlet pipe with the 2 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
CONNECT NO. 11 WATER BY-PASS HOSE
Connect the No. 11 water by-pass hose.
| *1 | Paint Mark |
| *a | Upper Side |
The direction of the hose clamp is indicated in the illustration.
INSTALL NO. 8 WATER BY-PASS HOSE
Install the No. 8 water by-pass hose.
| *1 | Paint Mark |
| *a | Upper Side |
| *b | Front |
When connecting the hose, make sure the paint marks and clips are as shown in the illustration.
The direction of each hose clamp is indicated in the illustration.
INSTALL NO. 2 WATER BY-PASS PIPE
Install the No. 2 water by-pass pipe with the 2 bolts and connect the hose.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
| *1 | Paint Mark |
| *a | Upper Side |
When connecting the hose, make sure the paint marks and clips are as shown in the illustration.
The direction of each hose clamp is indicated in the illustration.
INSTALL NO. 3 AIR TUBE
Install the No. 3 air tube with the bolt.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
INSTALL NO. 4 AIR TUBE
Install the No. 4 air tube with the bolt.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 2)
INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 1)
INSTALL FUEL TUBE SUB-ASSEMBLY
Install the fuel tube (Click here).
Install the 2 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
INSTALL FUEL HOSE
Install the fuel hose (Click here).
Install the fuel pipe clamp.
Connect the 2 clamps.
INSTALL ENGINE WIRE