Click here

БЛОК ДВИГАТЕЛЯ УСТАНОВКА

Click here
Click here Click here
  1. Click here

    INSTALL NOISE FILTER


    1. for Bank 2:

      Install the noise filter to the cylinder head cover with the bolt.

      10 N*m 102 kgf*cm 7 ft.*lbf
    2. for Bank 1:

      Install the noise filter to the cylinder head cover with the bolt.

      10 N*m 102 kgf*cm 7 ft.*lbf
  2. Click here

    INSTALL IGNITION COIL ASSEMBLY


    1. Install the 8 ignition coils with the 8 bolts.

      10 N*m 102 kgf*cm 7 ft.*lbf
  3. Click here

    INSTALL NO. 11 WATER BY-PASS HOSE


    1. A01EPZQE02

      Install the No. 11 water by-pass hose.

      Table 1. Text in Illustration
      *1 Paint Mark
      *a Rear
      *b Front
      Tip:
      • When connecting the hose, make sure the paint marks and clips are as shown in the illustration.

      • The direction of the hose clamp is indicated in the illustration.

  4. Click here

    INSTALL ENGINE WIRE


    1. Attach the 3 wire harness clamps to install the engine wire.

    2. Connect the 4 knock sensor connectors.

    3. Install the bolt.

      8.0 N*m 82 kgf*cm 71 in.*lbf
  5. Click here

    INSTALL NO. 1 ENGINE COVER

  6. Click here

    INSTALL NO. 2 ENGINE COVER

  7. Click here

    INSTALL SEPARATOR CASE


    1. Установите корпус сепаратора и закрепите его 4 болтами.

      10 Н*м 102 кгс*см 7 фунт-сила-футов
  8. Click here

    INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY


    1. Install the No. 1 idler pulley with the bolt.

      43 N*m 438 kgf*cm 32 ft.*lbf
  9. Click here

    INSTALL WATER PUMP PULLEY


    1. Temporarily install the water pump pulley with the 4 bolts.

    2. A01EOVUE01

      Using SST, hold the water pump pulley and tighten the 4 bolts.

      09960-10010 09962-01000 09963-01000
      21 N*m 214 kgf*cm 15 ft.*lbf
  10. Click here

    INSTALL NO. 1 WATER BY-PASS HOSE

  11. Click here

    INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY


    1. Connect the 4 hoses.

    2. Install the water by-pass pipe with the 2 bolts.

      10 N*m 102 kgf*cm 7 ft.*lbf
  12. Click here

    INSTALL NO. 3 ENGINE COVER


    1. A01EPM8

      Установите крышку двигателя № 3.

      Table 2. Обозначения на рисунке
      A01EO1M Передняя сторона двигателя
      Tip:

      Расположите крышку № 3 двигателя так, чтобы стрелка была направлена в сторону передней части двигателя, после чего установите ее.

  13. Click here

    INSTALL NO. 4 ENGINE COVER


    1. A01ESNX

      Установите крышку двигателя № 4.

      Table 3. Обозначения на рисунке
      A01EO1M Передняя сторона двигателя
      Tip:

      Расположите крышку № 4 двигателя так, чтобы стрелка была направлена в сторону передней части двигателя, после чего установите ее.

  14. Click here

    INSTALL NO. 2 FUEL DELIVERY PIPE SUB-ASSEMBLY


    1. Install the 2 delivery pipe spacers and 4 insulators to the cylinder head LH.

    2. Install the delivery pipe together with the injectors to the cylinder head LH.

    3. Install the 2 bolts.

      21 N*m 214 kgf*cm 15 ft.*lbf
      A01ES9CE03
      Note:

      Make sure that the part of the injector labeled B is between the parts of the delivery pipe labeled A.

      Table 4. Text in Illustration
      *1 Fuel Delivery Pipe
      *2 Fuel Injector
      *a CORRECT
      *b INCORRECT
    4. Connect the No. 7 wire harness connector.

  15. Click here

    INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY


    1. Install the 2 delivery pipe spacers and 4 insulators to the cylinder head RH.

    2. Install the delivery pipe together with the injectors to the cylinder head RH.

    3. Install the 2 bolts.

      21 N*m 214 kgf*cm 15 ft.*lbf
      A01ES9CE03
      Note:

      Make sure that the part of the injector labeled B is between the parts of the delivery pipe labeled A.

      Table 5. Text in Illustration
      *1 Fuel Delivery Pipe
      *2 Fuel Injector
      *a CORRECT
      *b INCORRECT
    4. Connect the No. 6 wire harness connector.

  16. Click here

    INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH


    1. Install the front No. 1 engine mounting bracket LH with the 4 bolts.

      35 N*m 357 kgf*cm 26 ft.*lbf
  17. Click here

    INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH


    1. Install the front No. 1 engine mounting bracket RH with the 4 bolts.

      35 N*m 357 kgf*cm 26 ft.*lbf
  18. Click here

    INSTALL NO. 1 EGR PIPE BRACKET


    1. Install the No. 1 EGR pipe bracket with the 3 bolts.

      21 N*m 214 kgf*cm 15 ft.*lbf
  19. Click here

    INSTALL NO. 1 WATER OUTLET PIPE


    1. Install the No. 1 water outlet pipe with the 2 bolts.

      10 N*m 102 kgf*cm 7 ft.*lbf
  20. Click here

    CONNECT NO. 11 WATER BY-PASS HOSE


    1. A01ERYAE01

      Connect the No. 11 water by-pass hose.

      Table 6. Text in Illustration
      *1 Paint Mark
      *a Upper Side
      Tip:

      The direction of the hose clamp is indicated in the illustration.

  21. Click here

    INSTALL NO. 8 WATER BY-PASS HOSE


    1. A01EPISE01

      Install the No. 8 water by-pass hose.

      Table 7. Text in Illustration
      *1 Paint Mark
      *a Upper Side
      *b Front
      Tip:
      • When connecting the hose, make sure the paint marks and clips are as shown in the illustration.

      • The direction of each hose clamp is indicated in the illustration.

  22. Click here

    INSTALL NO. 2 WATER BY-PASS PIPE


    1. A01EQWUE01

      Install the No. 2 water by-pass pipe with the 2 bolts and connect the hose.

      10 N*m 102 kgf*cm 7 ft.*lbf
      Table 8. Text in Illustration
      *1 Paint Mark
      *a Upper Side
      Tip:
      • When connecting the hose, make sure the paint marks and clips are as shown in the illustration.

      • The direction of each hose clamp is indicated in the illustration.

  23. Click here

    INSTALL NO. 3 AIR TUBE


    1. Install the No. 3 air tube with the bolt.

      10 N*m 102 kgf*cm 7 ft.*lbf
  24. Click here

    INSTALL NO. 4 AIR TUBE


    1. Install the No. 4 air tube with the bolt.

      10 N*m 102 kgf*cm 7 ft.*lbf
  25. Click here

    INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 2)

    (Click here)

  26. Click here

    INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 1)

    (Click here)

  27. Click here

    INSTALL FUEL TUBE SUB-ASSEMBLY


    1. Install the fuel tube (Click here).

    2. Install the 2 bolts.

      10 N*m 102 kgf*cm 7 ft.*lbf
  28. Click here

    INSTALL FUEL HOSE


    1. Install the fuel hose (Click here).

    2. Install the fuel pipe clamp.

    3. Connect the 2 clamps.

  29. Click here

    INSTALL ENGINE WIRE