Click here

ДАТЧИК ПОЛОЖЕНИЯ РАСПРЕДВАЛА УСТАНОВКА

Click here
Click here
  1. Click here

    INSTALL VVT SENSOR


    1. Install the 4 VVT sensors with the 4 bolts.

      10 N*m 102 kgf*cm 7 ft.*lbf
    2. Connect the 4 VVT sensor connectors.

  2. Click here

    INSTALL CAMSHAFT POSITION SENSOR


    1. Install the camshaft position sensor with the bolt.

      10 N*m 102 kgf*cm 7 ft.*lbf
    2. Connect the camshaft position sensor connector.

  3. Click here

    INSTALL AIR CLEANER CAP AND HOSE


    1. Install the air cleaner cap and hose, and then tighten the hose clamp.

      2.5 N*m 25 kgf*cm 22 in.*lbf
    2. Attach the 4 clamps.

    3. Connect the mass air flow meter connector and attach the clamp.

    4. Connect the No. 2 PCV hose and No. 1 air hose.

  4. Click here

    INSTALL V-BANK COVER SUB-ASSEMBLY


    1. A01ER0YE01

      Совместите 2 крюка крышки V-образного двигателя с кронштейном. Затем совместите 3 уплотнительных шайбы декоративной крышки V-образного двигателя с 3 штифтами и нажмите на декоративную крышку V-образного двигателя, чтобы закрепить штифты.

      Table 1. Обозначения на рисунке
      *1 Уплотнительная шайба
      *2 Штифт
      *3 Крюк
      *4 Кронштейн
  5. Click here

    INSTALL UPPER RADIATOR SUPPORT SEAL


    1. Установите верхнее уплотнение кронштейна радиатора и закрепите его 3 фиксаторами.

  6. Click here

    INSTALL ENGINE ROOM SIDE COVER RH


    1. Установите правую боковую крышку моторного отсека и закрепите ее 7 фиксаторами.

  7. Click here

    INSTALL ENGINE ROOM SIDE COVER LH


    1. Установите левую боковую крышку моторного отсека и закрепите ее 7 фиксаторами.