LIGHT CONTROL RHEOSTAT INSTALLATION


  1. INSTALL LIGHT CONTROL RHEOSTAT


    1. A0162MH

      Engage the 2 claws and install the light control rheostat.

    2. A015YLM

      Install the finish panel No. 2 retainer with switch with the 3 screws.

  2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY


    1. A0160VQ

      Connect the connectors.

    2. Engage the 7 clips and install the lower instrument panel finish panel sub-assembly.

  3. INSTALL SIDE INSTRUMENT PANEL LH


    1. A015ZMU

      Engage the 5 claws and 3 clips, and then install the side instrument panel LH.

  4. INSTALL FRONT DOOR OPENING TRIM COVER LH


    1. A016285

      Engage the 4 claws and install the front door opening trim cover LH.

  5. INSTALL FRONT DOOR SCUFF PLATE LH


    1. A015ZPR

      Engage the 4 clips.

    2. A0161H2

      Engage the 7 claws and install the front door scuff plate LH.