DESCRIPTION
This is the power source circuit to operate the gateway ECU.
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
INSPECT GATEWAY ECU
Disconnect the gateway ECU connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE Click here