SKID CONTROL ECU INSTALLATION


  1. INSTALL SKID CONTROL ECU


    1. A0162A6E02

      Install the skid control ECU with the 3 screws.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }

      Tech Tips


      • Align positioning boss (A) of the blower assembly with the hole of the skid control ECU.

      • Securely engage hook (B) of the skid control ECU with the blower assembly.

    2. A01605Q

      Connect the 3 connectors to the skid control ECU.

  2. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY


    1. A015YZF

      Engage the 4 clips and install the No. 2 instrument panel under cover sub-assembly.

  3. INSTALL SIDE INSTRUMENT PANEL RH


    1. A015ZMM

      Engage the 5 claws and 3 clips, and then install the side instrument panel RH.

  4. INSTALL FRONT DOOR OPENING TRIM COVER RH

    Tech Tips

    Use the same procedure for the RH side and LH side Click here.

  5. INSTALL FRONT DOOR SCUFF PLATE RH

    Tech Tips

    Use the same procedure for the RH side and LH side Click here.

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  7. PERFORM YAW RATE AND ACCELERATION SENSOR ZERO POINT CALIBRATION

    Click here

  8. CHECK FOR SENSOR SIGNAL

    Click here

  9. CHECK AND CLEAR DTC

    Tech Tips

    Click here