CANISTER INSTALLATION


  1. INSTALL CHARCOAL CANISTER SUB-ASSEMBLY


    1. Install the charcoal canister base bracket to the charcoal canister sub-assembly.

    2. A01629H

      Install the charcoal canister sub-assembly to the body with the 3 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    3. Connect the vent line hose to the charcoal canister sub-assembly.

    4. Connect the purge line hose to the charcoal canister sub-assembly.

  2. INSTALL REAR SUSPENSION MEMBER BRACE RH


    1. Install the rear suspension member brace RH with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }