INTAKE MANIFOLD INSTALLATION


  1. INSTALL INTAKE AIR SURGE TANK ASSEMBLY


    1. Install the union to check valve hose bracket with the bolt (for LHD).

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. A0162BF

      Install the V-bank cover bracket sub-assembly with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Install 2 new gaskets to the intake air surge tank assembly.

    4. A0162R3E01

      Temporarily install the intake air surge tank assembly with the 2 nuts and 8 bolts. Then tighten the 2 nuts and 8 bolts uniformly in the order shown in the illustration.

      Torque:
      21 N*m  { 214 kgf*cm, 16 ft.*lbf }
  2. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY


    1. Apply gasoline to 8 new O-ring and install one to each injector.

      Note

      Check that there is no damage or foreign objects in the groove of the injector when installing the O-ring. If an injector falls out of the delivery pipe during removal or installation, reinstall the injector to the delivery pipe using a new O-ring between the injector and delivery pipe.

    2. A01610T

      Install the injectors with delivery pipe assembly and 4 spacers with the 4 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 16 ft.*lbf }
    3. Install the 2 wire harnesses with the 4 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  3. CONNECT NO. 3 FUEL HOSE


    1. A0160HJE02

      Push in the fuel tube connector to the No. 3 fuel hose until the fuel tube connector makes a "click" sound.

      Note


      • Check that there is no damage or foreign objects on the fuel pipe connectors.

      • After connecting, check that the fuel tube connector and the pipe are securely connected by pulling on them.

    2. A0160LG

      Install the 2 fuel pipe clamps.

  4. CONNECT VACUUM HOSE ASSEMBLY (for LHD)


    1. A015ZT0E01

      Connect the vacuum hose assembly to the intake air surge tank assembly with the clamp.

    2. Connect the vacuum hose assembly to the hose clamp.

      Note

      Align the vacuum hose assembly matchmarks and the hose clamps as shown in the illustration.

  5. CONNECT VACUUM HOSE ASSEMBLY (for RHD)


    1. A016053

      Connect the vacuum hose assembly to the intake air surge tank assembly with the clamp.

  6. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY


    1. A016088E01

      Install the water by-pass pipe to the intake air surge tank assembly with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the heater inlet water hose, heater outlet water hose, water inlet hose, water outlet hose, and water by-pass hose to the water by-pass pipe sub-assembly with the 5 clamps.

  7. INSTALL INJECTOR DRIVER


    1. A015Z2OE01

      Install the No. 2 V-bank cover bracket sub-assembly with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Install the 2 injector drivers with the 8 nuts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
    3. Connect the 4 injector driver connectors to the injector driver.

      Tech Tips

      To connect the injector driver connectors, move the lock lever to lock the connector.

  8. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY


    1. A015ZPT

      Connect the ventilation hose.

    2. Install the No. 1 vacuum switching valve assembly with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 16 ft.*lbf }
    3. Connect the No. 2 fuel vapor feed hose to the No. 1 vacuum switching valve assembly.

    4. Connect the fuel vapor feed hose to the intake air surge tank assembly.

  9. CONNECT ENGINE WIRE (for LHD)


    1. Connect the engine wire harness connector.

      Tech Tips

      To connect the injector driver connectors, move the lock lever to lock the connector.


      1. Connect the engine wire with the 4 nuts. (A)

        A016379E01
        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      2. Connect the 4 connectors and 5 clamps. (B)

      3. Install the ground cable with the bolt. (C)

        Torque:
        5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
      4. Connect the 4 injector driver connectors. (D)

      5. Install the wire harness with the nut to the relay box. (E)

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      6. Connect the 9 connectors and 3 clamps. (F)

        A0160O7E02
      7. Install the harness with the nut to the +B terminal. (G)

        Torque:
        12 N*m  { 122 kgf*cm, 9 ft.*lbf }
      8. Connect the generator connector and 2 clamps. (H)

      9. Install the oil cooler tube sub-assembly withe the bolt and nut. (I)

        Torque:
        Bolt
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
        Nut
        7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
      10. Connect the 2 connectors and then install the nut. (J)

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      11. Connect the starter connector. (K)

      12. Install the 2 bolts to the No. 3 exhaust manifold heat insulator. (L)

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  10. CONNECT ENGINE WIRE (for RHD)


    1. Connect the engine wire harness connector.

      Tech Tips

      To connect the injector driver connectors, move the lock lever to lock the connector.


      1. Connect the engine wire with the 4 nuts. (A)

        A0162MJE01
        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      2. Connect the 4 connectors and 3 clamps. (B)

      3. Install the ground cable with the bolt. (C)

        Torque:
        5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
      4. Connect the 4 injector driver connectors. (D)

      5. Connect the 9 connectors and 3 clamps. (E)

        A0160O7E03
      6. Install the harness with the nut to the +B terminal. (F)

        Torque:
        12 N*m  { 122 kgf*cm, 9 ft.*lbf }
      7. Connect the generator connector and 2 clamps. (G)

      8. Install the oil cooler tube sub-assembly with the bolt and nut. (H)

        Torque:
        Bolt
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
        Nut
        7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
      9. Connect the 2 connectors and then install the nut. (I)

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      10. Connect the starter connector. (J)

      11. Install the 2 bolts to the No. 3 exhaust manifold heat insulator. (K)

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  11. INSTALL OIL COOLER TUBE SUB-ASSEMBLY


    1. A0161P0

      Install the oil cooler tube sub-assembly with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  12. INSTALL THROTTLE BODY ASSEMBLY


    1. A0163H9E01

      Connect the No. 4 water by-pass hose and No. 5 water by-pass hose to the throttle body assembly.

      Note

      Position the claws of the clamps as shown in the illustration.

    2. A01631Y

      Set the throttle body assembly and new gasket with the 2 stud bolts.

    3. Using a "TORX" socket E6, tighten the 2 stud bolts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    4. A01628P

      Install the 2 bolts and 2 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    5. A0162X5

      Connect the No. 4 water by-pass hose with the hose clamp.

    6. A0162ZZ

      Connect the No. 5 water by-pass hose with the hose clamp.

    7. A0162PC

      Connect the throttle body connector.

  13. INSTALL AIR CLEANER CASE SUB-ASSEMBLY


    1. A015ZYF

      Install the air cleaner case sub-assembly with the 2 bolts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    2. Connect the vacuum switching valve connector and clamp.

    3. A0163D8

      Connect the vacuum hose and 2 clamps.

  14. INSTALL AIR CLEANER CAP SUB-ASSEMBLY


    1. A015YT4

      Install the air cleaner cap sub-assembly with air cleaner hose and lock the 2 clamps.

      Tech Tips

      Tightening torque for the hose clamp located between the air cleaner cap sub-assembly and air cleaner hose assembly is as follows.

      Torque:
      4.0 N*m  { 41 kgf*cm, 35 in.*lbf }
    2. A015ZWF

      Connect the air cleaner hose to the throttle body with the hose clamp.

      Torque:
      4.0 N*m  { 41 kgf*cm, 35 in.*lbf }
    3. A015YRW

      Connect the 2 ventilation hoses with the 2 hose clamps.

    4. A01622I

      Connect the mass air flow meter connector and wire harness clamp.

  15. INSTALL NO. 1 AIR CLEANER INLET


    1. A01612G

      Install the No. 1 air cleaner inlet with the bolt and clip.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
  16. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  17. ADD ENGINE COOLANT

    Note

    Before adding coolant, turn the A/C switch OFF.

    Total capacity
    11.9 liters (12.6 US qts, 10.5 Imp. qts)

    1. Tighten the radiator drain cock plug by hand.

    2. Tighten the 2 cylinder block drain cock plugs.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    3. Add TOYOTA Super Long Life Coolant (SLLC) into the radiator reservoir.

      Capacity
      Approximately 5.0 liters (5.3 US qts, 4.4 Imp. qts)

      Tech Tips


      • LEXUS vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

      • Contact any authorized LEXUS dealer or repairer or another duly qualified and equipped professional for further details.

      • Thermostat opening timing can be confirmed by squeezing the inlet radiator hose and sensing vibrations when the coolant starts to flow inside the hose.

    4. A015YN3

      Further add coolant into the reservoir until it reaches the FULL line.

    5. Squeeze the No. 1 and No. 2 radiator hoses several times, and then check the coolant level.

      If the coolant level is low, add coolant.

    6. A0161WSE01

      Using a 6 mm socket hexagon wrench, install the vent plug.

      Torque:
      1.5 N*m  { 15 kgf*cm, 13 in.*lbf }
    7. Bleed air from the cooling system.

      Note

      Before starting the engine, turn the A/C switch off.


      1. While idling the engine for approximately 10 minutes, make sure that the coolant remains at the FULL line by adding coolant as necessary.

      2. A0160C3E01

        After idling the engine for 10 minutes, add coolant to the level shown in the illustration.

        Capacity
        Approximately 2.5 to 3.5 liters (2.6 to 3.7 US qts, 2.2 to 3.1 Imp.qts)
      3. Close the radiator reservoir cap, and run the engine at 1500 to 2000 rpm for 5 minutes.

        Tech Tips

        Thermostat opening timing can be confirmed by squeezing the No. 1 radiator hose and sensing vibrations when the SLLC starts to flow inside the hose.

        CAUTION:

        When squeezing the radiator hose:


        • Wear protective gloves.

        • Be careful as the radiator hose is hot.

        • Keep your hands away from the radiator fan.

    8. Stop the engine and wait until the coolant cools down to ambient temperature.

      CAUTION:

      Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot coolant and steam may be released and cause serious burns.

    9. A015YN3

      Check the coolant level.

      If the coolant level is below the FULL line, add coolant until it reaches the FULL line.

  18. INSPECT FOR COOLANT LEAK

    Note

    Before performing each inspection, turn the A/C switch OFF.

    CAUTION:

    Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.


    1. A016221

      Fill the radiator with coolant and attach a radiator cap tester.

    2. Warm up the engine.

    3. Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop.

      If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.

  19. INSTALL ENGINE ROOM SIDE COVER RH (for LHD)


    1. A0161AL

      Install the engine room side cover RH with the 3 clips.

  20. INSTALL ENGINE ROOM SIDE COVER RH (for RHD)


    1. A015YK3

      Install the engine room side cover RH with the 4 clips.

  21. INSTALL ENGINE ROOM SIDE COVER LH (for LHD)


    1. A016120

      Install the engine room side cover LH with the 5 clips.

  22. INSTALL ENGINE ROOM SIDE COVER LH (for RHD)


    1. A015Z63

      Install the engine room side cover LH with the 4 clips.

  23. INSTALL COOL AIR INTAKE DUCT SEAL


    1. A015ZFO

      Install the cool air intake duct seal with the 9 clips.

  24. INSTALL NO. 1 ENGINE ROOM RELAY BLOCK COVER


    1. Install the No. 1 engine room relay block cover.

  25. INSTALL V-BANK COVER SUB-ASSEMBLY


    1. A0160IP

      Engage the 4 clips to install the V-bank cover sub-assembly.

      Note


      • Be sure to engage the clips securely.

      • Do not apply excessive force or hit the cover to engage the clips. This may cause the cover to break.

  26. INSTALL NO. 2 ENGINE UNDER COVER

  27. INSTALL REAR ENGINE UNDER COVER RH

  28. INSTALL ENGINE UNDER COVER