AIR CONDITIONING PANEL (for Automatic Air Conditioning System) INSTALLATION


  1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY


    1. Connect the connector.

    2. A017EE0

      Engage the 4 clips and install the air conditioning control assembly.

  2. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY (w/o Smart Entry and Start System)


    1. A017EYQE01

      Apply protective tape to the areas shown in the illustration.

    2. Connect each connector.

    3. Engage the 10 claws and 8 clips, and install the center instrument cluster finish panel assembly.

      Note

      Do not the damage the instrument panel safety pad assembly and lower instrument panel finish panel sub-assembly.

  3. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY (w/ Smart Entry and Start System)


    1. A017D5UE01

      Apply protective tape to the areas shown in the illustration.

    2. Connect each connector.

    3. Engage the 10 claws and 8 clips, and install the center instrument cluster finish panel assembly.

      Note

      Do not the damage the instrument panel safety pad assembly and lower instrument panel finish panel sub-assembly.