INSPECT A/C PRESSURE SENSOR
Install the manifold gauge set.
Disconnect the connector from the A/C pressure sensor.
Connect the three 1.5 V dry cell batteries' positive (+) lead to terminal 3 and the negative (-) lead to terminal 1.
Connect the voltmeter's positive (+) lead to terminal 2 and the negative (-) lead to terminal 1.
Measure the voltage according to the value(s) in the table below.
| Standard voltage | ||||||
|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the A/C pressure sensor.