OUTER REAR VIEW MIRROR INSTALLATION

Tech Tips


  • Use the same procedures for the LH side and RH side.

  • The procedures listed below are for the LH side.

  • A bolt without a torque specification is shown in the standard bolt chart Click here.


  1. INSTALL OUTER REAR VIEW MIRROR ASSEMBLY LH


    1. Install the outer rear view mirror assembly LH with the 3 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    2. Attach the 3 clamps.

  2. INSTALL FRONT DOOR NO. 2 SERVICE HOLE COVER LH


    1. Apply new butyl tape to the door.

    2. A01GKQNE01
      Text in Illustration
      *a Reference Point

      Install a new front door No. 2 service hole cover LH using the reference points on the front door panel.

      Tech Tips


      • When installing the service hole cover, pull the links and connectors through the service hole cover.

      • There should be no wrinkles or folds after attaching the service hole cover.

      • After attaching the service hole cover, check the sealing quality.

  3. INSTALL MULTIPLEX NETWORK FRONT DOOR ECU LH


    1. Install the front multiplex network door ECU LH to the door panel with the 2 screws.

    2. Connect the 3 connectors.

  4. INSTALL DOOR FRAME GARNISH LH


    1. Install the door frame garnish LH with the 2 clips.

  5. INSTALL FRONT DOOR TRIM BOARD SUB-ASSEMBLY LH


    1. Connect the connector.

    2. A01GNLN

      Connect the 2 cables to the inside handle.

    3. Attach the 13 clips to install the front door trim board sub-assembly LH.

    4. Install the 3 screws.

  6. INSTALL POWER WINDOW REGULATOR MASTER SWITCH ASSEMBLY WITH FRONT DOOR ARMREST BASE PANEL


    1. Connect the connector.

    2. A01GHPZ

      Attach the 2 claws to install the power window regulator master switch assembly with front door armrest base panel.

  7. INSTALL FRONT DOOR INSIDE HANDLE BEZEL PLUG LH


    1. Attach the 3 claws to install the front door inside handle bezel plug LH.

  8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  9. INSTALL COWL TOP VENTILATOR LOUVER RH