DESCRIPTION
PTC heater relays are closed in accordance with signals from the air conditioning amplifier and power is supplied to the PTC heater installed on the radiator heater unit.
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
INSPECT FUSE (PTC HTR1, PTC HTR2, PTC HTR3, PTC HTR)
Remove the PTC HTR1 and PTC HTR3 fuses, and PTC HTR and PTC HTR2 H-fuses from the engine room No. 1 relay block.
Measure the resistance of the fuses.
| Standard resistance | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPLACE FUSE |
| OK |
|
CHECK AIR CONDITIONING AMPLIFIER
Remove the air conditioning amplifier with its connectors still connected Click here.
Turn the engine switch on (IG).
When the PTC heater operating conditions are met (engine at idling speed or faster, ambient temperature is 10°C (50°F) or less, engine coolant temperature is 65°C (149°F) or less, set temperature switch is set to MAX HOT), turn the blower switch to the LO setting.
Measure the voltage according to the value(s) in the table below.
| Standard voltage | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| OK |
|
REPLACE AIR CONDITIONING AMPLIFER Click here |
| NG |
|
INSPECT PTC HEATER RELAY (PTC HTR1, PTC HTR2, PTC HTR3)
Remove the PTC heater relays from the No. 5 relay block.
Measure the resistance according to the value(s) in the table below.
| Standard resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPLACE PTC HEATER RELAY |
| OK |
|
CHECK HARNESS AND CONNECTOR (PTC HEATER RELAY - PTC HEATER)
Remove the PTC heater relays from the No. 5 relay block.
Disconnect the L40 PTC heater connector.
Measure the resistance according to the value(s) in the table below.
| Standard resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK PTC HEATER
Disconnect the L40 and L41 PTC heater connectors.
Measure the resistance according to the value(s) in the table below.
| Standard resistance | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPLACE PTC HEATER Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BODY GROUND)
Remove the air conditioning amplifier with its connectors still connected Click here.
Measure the resistance according to the value(s) in the table below.
| Standard resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPLACE AIR CONDITIONING AMPLIFER Click here