FLOOR SHIFT ASSEMBLY INSTALLATION


  1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY


    1. Install the transmission floor shift assembly with the 4 bolts.

      Torque:
      8.3 N*m  { 85 kgf*cm, 74 in.*lbf }
    2. Connect the 6 wire harness clamps to the transmission floor shift assembly.

    3. Connect the 2 connectors.

  2. INSTALL NO. 1 CONSOLE BOX DUCT


    1. Install the No. 1 console box duct with the 2 clips.

    2. Connect the 2 wire harness clamps to the No. 1 console box duct.

  3. INSTALL CONSOLE BOX ASSEMBLY

    for 5-Passenger with Ottoman: Click here

    w/o Rear Seat Entertainment System: Click here

    w/ DVD Player: Click here

  4. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY


    1. Temporarily connect the floor shift gear shifting rod sub-assembly to the connecting rod swivel with the nut.

      Tech Tips

      The nut will be tightened to a torque specification during the shift lever position adjustment procedure.

  5. ADJUST SHIFT LEVER POSITION

    Click here

  6. INSTALL FRONT FLOOR NO. 1 HEAT INSULATOR


    1. for 2WD:

      Install the heat insulator with the 4 nuts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    2. for AWD:

      Install the heat insulator with the 6 nuts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  7. INSTALL FRONT EXHAUST PIPE ASSEMBLY

    Click here

  8. INSPECT SHIFT LEVER POSITION

    Click here