INSTALL V-RIBBED BELT
Install the V belt as shown in the illustration.
Note
Check that the drive belt is properly set to each pulley.
Rotate the tensioner pulley counterclockwise, and then remove the fix bar.
INSTALL INTAKE AIR CONNECTOR PIPE
Align the protrusion of the intake air resonator with the cutout of the bracket and insert the protrusion.
Install the intake air connector pipe with the 3 hose clamps.
Tech Tips
Insert the protrusion of the intake air connector pipe into the hole of the hose clamp.
The intake air connector pipe and throttle body clamp can be tightened within the range of 4.0 N*m (41 kgf*cm, 35 in.*lbf) to 5.5 N*m (56 kgf*cm, 49 in.*lbf), and the intake air connector pipe and air cleaner cap clamp can be tightened within the range of 2.0 N*m (20 kgf*cm, 18 in.*lbf) to 5.5 N*m (56 kgf*cm, 49 in.*lbf).
Attach the 2 wire harness clamps.
Connect the No. 1 and No. 2 ventilation hoses to the intake air connector pipe.
Tech Tips
Position the claws of the clamps as shown in the illustration.
Install the clamps so that they are within the hose's paint marks.
INSTALL NO. 1 AIR CLEANER INLET
Align the holes with the connection areas labeled A, and attach the No. 1 air cleaner inlet.
Install the No. 1 air cleaner inlet with the 2 bolts.
INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY
Attach the 4 clips B.
Note
Make sure the clips are attached securely.
Attaching the clips forcefully or hitting the top of the clips may damage them.
Install the air cleaner inlet cover sub-assembly with the 5 clips labeled A.
INSTALL V-BANK COVER SUB-ASSEMBLY
After sliding the cover from the vehicle front to the rear to attaching the 2 clips labeled A, attach the 4 clips labeled B and install the V-bank cover sub-assembly.
Note
Make sure the clips are attached securely.
Attaching the clips forcefully or hitting the top of the clips may damage them.