INSTALL CAMSHAFT BEARING CAP (for Bank 1)
Apply a light coat of engine oil to the camshaft journals, camshaft housings and bearing caps.
Install the No. 3 and No. 4 camshaft to the camshaft housing.
Confirm the marks and numbers on the camshaft bearing caps and place them each in their proper positions and directions.
Temporarily install the 8 bolts in the order shown in the illustration.
INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY (for Bank 1)
Make sure that the valve rocker arms are installed as shown in the illustration.
Apply seal packing in a continuous line as shown in the illustration.
| Seal packing |
|---|
| Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent |
| Standard seal diameter |
|---|
| 3.5 to 4.0 mm (0.138 to 0.158 in.) |
Note
Remove any oil from the contact surface.
Install the camshaft housing within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
Do not start the engine for at least 2 hours after the installation.
Install the camshaft housing, and install the 18 bolts in the order shown in the illustration.
Note
Make sure that the knock pin of the camshaft is positioned as shown in the illustration before installing the camshaft housing.
Tighten the 8 bolts in the order shown in the illustration.
Note
Thoroughly wipe clean any seal packing.
INSTALL NO. 3 CHAIN TENSIONER ASSEMBLY
Install the chain tensioner with the 2 bolts.
While pushing down the No. 3 chain tensioner, insert a pin with a diameter of 1.0 mm (0.039 in.) into the hole to fix it in place.
INSTALL CHAIN SUB-ASSEMBLY (for Bank 1)
Align the No. 1 chain's orange mark plates with the camshaft timing gear's timing mark, and attach the chain to the gear as shown in the illustration.
Align the No. 1 chain's orange mark plate with the crankshaft timing gear's timing mark, and attach the chain to the gear as shown in the illustration.
Align the No. 2 chain's mark plates (yellow) with the timing marks (1-dot mark) of the camshaft timing gear assembly and camshaft timing exhaust gear assembly, and attach the No. 2 chain to the gears as shown in the illustration.
Tech Tips
The crankshaft timing gear and camshaft exhaust gear assembly will be installed with the No. 1 and No. 2 chains connected to the gears.
Install the crankshaft timing gear to the crankshaft.
Align and attach the knock pin of the No. 3 camshaft with the pin hole of the camshaft timing gear assembly.
Using the hexagonal portion of the No. 4 camshaft, align and attach the knock pin of the No. 4 camshaft with the pin hole of the camshaft timing exhaust gear assembly.
Note
Because the gears' timing mark positions may shift due to looseness of the No. 1 chain, use the hexagonal portion of the camshaft to hold the No. 3 camshaft in place until the No. 1 chain tensioner is installed.
Remove the pin from the No. 2 chain tensioner.
INSTALL CHAIN TENSIONER SLIPPER (for Bank 1)
Tech Tips
If you cannot install the chain tensioner slipper due to the tension of the chain, use the hexagonal portion of the camshaft to loosen the chain and install the chain tensioner.
INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY (for Bank 1)
Move the stopper plate upward to release the lock, and push the plunger deep into the tensioner.
Move the stopper plate downward to set the lock, and insert a hexagon wrench into the hole of the stopper plate.
Install a new gasket and chain tensioner with the 2 bolts.
INSTALL NO. 1 CHAIN VIBRATION DAMPER (for Bank 1)
Install the vibration damper with the 2 bolts.
Remove the hexagon wrench from the No. 1 chain tensioner.
TIGHTEN CAMSHAFT TIMING GEAR ASSEMBLY
for Bank 1:
Using a wrench, hold the hexagonal portion of the No. 3 camshaft.
Using a 12 mm socket hexagon wrench, tighten the camshaft timing gear assembly with a new bolt.
Using a wrench to hold the hexagonal portion of the No. 4 camshaft, tighten the camshaft timing exhaust gear assembly with the bolt.
for Bank 2:
Using a wrench, hold the hexagonal portion of the No. 1 camshaft.
Using a 12 mm socket hexagon wrench, tighten the camshaft timing gear assembly with a new bolt.
Using a wrench to hold the hexagonal portion of the No. 2 camshaft, tighten the camshaft timing exhaust gear assembly with the bolt.
CHECK NO. 1 CYLINDER TO TDC / COMPRESSION
Temporarily install the crankshaft pulley bolt.
Rotate the crankshaft clockwise, and check that the timing marks on the crankshaft timing gear and camshaft timing gears are as shown in the illustration.
Remove the crankshaft pulley bolt.
INSTALL TIMING CHAIN COVER SUB-ASSEMBLY