HIGH PITCHED HORN INSTALLATION


  1. INSTALL HIGH PITCHED HORN

    A01392C

    1. Install the bolt.

      Torque:
      19.5 N*m  { 199 kgf*cm, 14 ft.*lbf }
    2. Connect the connector.

  2. INSTALL ENGINE UNDER COVER AIR GUIDE

    A0138W0

    1. Engage the 2 claws and install the engine under cover air guide.

    2. Tighten the 10 bolts and 2 screws.

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }