AIR CONDITIONING SWITCH INSTALLATION


  1. INSTALL COOLER CONTROL SWITCH ASSEMBLY

    A0136XAE01

    1. Engage the 4 claws and install the cooler control switch assembly.

  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY CENTER

    A0136KWE02

    1. Connect the connectors.

    2. Engage the 4 clips and 3 claws and install the instrument cluster finish panel center.

    3. Install the screw.

    4. Install the control knob.

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }