BACK-UP LIGHT SWITCH INSTALLATION


  1. INSTALL BACK-UP LIGHT SWITCH ASSEMBLY

    A0136VLE01

    1. Using SST, install the back-up light switch with a new gasket to the transaxle case.

      SST
      09817-16011
      Torque:
      40 N*m  { 410 kgf*cm, 30 ft.*lbf }
    2. A01372N

      Install the back-up light switch wire harness to the 2 clamps.

    3. Connect the back-up light switch connector.

  2. INSTALL TRANSVERSE ENGINE ENGINE MOUNTING INSULATOR


    1. Install the transverse engine engine mounting insulator with the transverse engine engine mounting bracket with the 7 bolts.

      Torque:
      52 N*m  { 530 kgf*cm, 38 ft.*lbf }
  3. INSTALL BATTERY CLAMP SUB-ASSEMBLY

    A0135TUE03

    1. Install the battery clamp sub-assembly with the 3 bolts.

      Torque:
      Bolt A
      7.4 N*m  { 75 kgf*cm, 65 in.*lbf }
      Bolt B
      17 N*m  { 175 kgf*cm, 13 ft.*lbf }
  4. INSTALL ENGINE ROOM RELAY BLOCK


    1. Engage the 3 wire harness clamps.

    2. A0138XKE01

      Engage the claw and install the engine room relay block.

    3. Install the 2 bolts.

      Torque:
      Bolt A
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
      Bolt B
      8.4 N*m  { 85 kgf*cm, 74 in.*lbf }
  5. INSTALL BATTERY

    A0136B5E01
    Text in Illustration
    *a Identification line
    *b A-A
    *c B-B

    1. Install the battery onto the battery clamp sub-assembly, as shown in the illustration.

      Note


      • The identification line should be seen after installing the battery.

      • The battery clamp should be in contact with the battery after the installation.

    2. Install the battery clamp with the bolt.

      Torque:
      15 N*m  { 154 kgf*cm, 11 ft.*lbf }
    3. Connect the battery positive (+) terminal with the nut.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }