TRANSMISSION CONTROL CABLE INSTALLATION


  1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    1. Push the transmission control cable in through the floor hole.

    2. Install the retainer and clamp onto the floor with the 3 nuts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
  2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY


    1. Connect the transmission control shift cable to the shift lever retainer.

    2. A01368OE01

      Connect the transmission control shift cable to the floor shift shift lever.

    3. Connect the transmission control select cable to the shift lever retainer.

    4. A0138X1

      Connect the transmission control select cable to the floor shift shift lever.

      Note


      • Connect the select cable point with the serrated part facing upwards.

      • Insert the clip in the orientation shown in the illustration.

  3. INSTALL FLOOR SHIFT SHIFT LEVER ASSEMBLY


    1. A013739

      Install the shift lever with the 4 bolts.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    2. A0137WR

      Install the wire harness.

  4. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY

    A0136KNE01

    1. Connect the transmission select cable to the manual transaxle with the new clip A and clip B.

    2. A0135UNE01

      Connect the transmission shift cable to the manual transaxle with the new clip A and clip B.

  5. INSTALL BATTERY CLAMP SUB-ASSEMBLY

    A0135TUE03

    1. Install the battery clamp sub-assembly with the 3 bolts.

      Torque:
      Bolt A
      7.4 N*m  { 75 kgf*cm, 65 in.*lbf }
      Bolt B
      17 N*m  { 175 kgf*cm, 13 ft.*lbf }
  6. INSTALL ENGINE ROOM RELAY BLOCK


    1. Engage the 3 wire harness clamps.

    2. A0138XKE01

      Engage the claw and install the engine room relay block.

    3. Install the 2 bolts.

      Torque:
      Bolt A
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
      Bolt B
      8.4 N*m  { 85 kgf*cm, 74 in.*lbf }
  7. INSTALL BATTERY

    A0136B5E01
    Text in Illustration
    *a Identification line
    *b A-A
    *c B-B

    1. Install the battery onto the battery clamp sub-assembly, as shown in the illustration.

      Note


      • The identification line should be seen after installing the battery.

      • The battery clamp should be in contact with the battery after the installation.

    2. Install the battery clamp with the bolt.

      Torque:
      15 N*m  { 154 kgf*cm, 11 ft.*lbf }
    3. Connect the battery positive (+) terminal with the nut.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  8. INSTALL CONSOLE BOX

    A01378K

    1. Engage the 2 claws and install the console box.

    2. Install the bolt <B>.

    3. Install the box bottom mat.

    4. Turn the shift knob in the direction indicated by the arrow in the illustration to install it.

  9. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY

  10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }