GENERATOR INSTALLATION


  1. INSTALL GENERATOR ASSEMBLY


    1. A0138RAE01

      Install the generator with the 2 bolts.

      Torque:
      Bolt (A)
      54 N*m  { 551 kgf*cm, 40 ft.*lbf }
      Bolt (B)
      34 N*m  { 347 kgf*cm, 25 ft.*lbf }
    2. A013629E02

      Install the wire harness clamp with the bolt.

      Torque:
      8.4 N*m  { 85 kgf*cm, 74 in.*lbf }
    3. Install the generator wire with the nut to the terminal D.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
    4. Install the generator wire with the nut to the terminal B.

      Torque:
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
    5. Install the terminal cap.

  2. INSTALL FAN AND GENERATOR V BELT


    1. A013738E02
      Text in Illustration
      *1 Generator Pulley
      *2 Idle Pulley
      *3 Compressor Pulley
      *4 Crankshaft Pulley
      *a No Measurable Clearance
      *b Specified Point
      *c w/ Air Conditioning System
      *d w/o Air Conditioning System

      Install the fan and generator V belt.

    2. Loosely tighten the B bolt until there is no measurable clearance.

    3. Turn the C bolt to adjust tension of the fan and generator V belt. Click here

    4. Inspect the fan and generator V belt.

    5. Tighten the B bolt.

      Torque:
      34 N*m  { 347 kgf*cm, 25 ft.*lbf }
    6. Tighten the A bolt.

      Torque:
      49 N*m  { 500 kgf*cm, 36 ft.*lbf }
    7. Visually check the generator wiring and listen for abnormal noise.

  3. INSTALL ENGINE UNDER COVER AIR GUIDE

  4. INSTALL FRONT BUMPER COVER

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.


    1. Connect the cable to the negative battery terminal.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }