DESCRIPTION
In the diagram below, when the engine is cranked, a current flows from terminal ST2 of the ignition switch to the starter relay coil and also a current flows to terminal STA of the ECM (STA signal). When the STA signal and NE signal are transmitted to the ECM, the power transistor (Tr) is turned ON, a current flows to the coil of the circuit opening relay to switch the relay on, the power is supplied to the fuel pump and the fuel pump operates.
While the NE signal is generated (when engine running), the ECM keeps Tr ON (circuit opening relay ON) and the fuel pump also keeps operating.
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
PERFORM ACTIVE TEST BY INTELLIGENT TESTER (Active the Fuel Pump Speed Control)
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON and turn the intelligent tester ON.
Select the following menu items: Powertrain / Engine and ECT / Active Test / Active the Fuel Pump Speed Control.
Check the operation of the relay while operating it using the intelligent tester.
| Standard |
|---|
| Operating sounds can be heard from the relay. |
| OK |
|
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN ON PROBLEM SYMPTOMS TABLE |
| NG |
|
CHECK ECM POWER SOURCE CIRCUIT
| NG |
|
REPAIR OR REPLACE POWER SOURCE CIRCUIT |
| OK |
|
INSPECT ENGINE ROOM RELAY BLOCK (CIRCUIT OPENING RELAY)
Remove the engine room R/B.
Remove the engine room R/B lower cover.
Disconnect the 5 connectors from the engine room R/B.
Measure the resistance.
| Standard resistance | ||||||
|---|---|---|---|---|---|---|
|
Reinstall the circuit opening relay.
| NG |
|
REPLACE ENGINE ROOM RELAY BLOCK |
| OK |
|
CHECK HARNESS AND CONNECTOR (ENGINE ROOM RELAY BLOCK - ECM)
Remove the engine room R/B.
Remove the engine room R/B lower cover.
Disconnect the B25 and B26 ECM connectors.
Measure the resistance.
| Standard resistance (Check for open) | ||||||
|---|---|---|---|---|---|---|
|
| Standard resistance (Check for open) | ||||||
|---|---|---|---|---|---|---|
|
Reinstall the engine room R/B.
Reconnect the ECM connectors.
| NG |
|
REPAIR OR REPLACE HARNESS AND CONNECTOR |
| OK |
|
INSPECT FUEL PUMP
| NG |
|
REPAIR OR REPLACE FUEL PUMP |
| OK |
|
CHECK HARNESS AND CONNECTOR (ENGINE ROOM RELAY BLOCK - FUEL PUMP, FUEL - BODY GROUND)
Remove the engine room R/B.
Remove the engine room R/B lower cover.
Disconnect the H2 fuel pump connector.
Measure the resistance.
| Standard resistance (Check for open) | ||||||
|---|---|---|---|---|---|---|
|
| Standard resistance (Check for short) | ||||
|---|---|---|---|---|
|
Reinstall the engine room R/B.
Reconnect the fuel pump connector.
| NG |
|
REPAIR OR REPLACE HARNESS AND CONNECTOR |
| OK |
|
REPAIR OR REPLACE FUEL PUMP