Note
Turn the ignition switch off for 60 seconds before performing the following inspections:
INSPECT LIGHTING TIME OF GLOW INDICATOR LIGHT
Turn the ignition switch to the ON position, and measure the lighting time.
| Lighting time |
|---|
| Refer to the graph. |
INSPECT PRE-HEATING
Turn the ignition switch to the ON position, measure the time when the battery voltage is applied to the glow plugs.
| Pre-Heating time | ||||||
|---|---|---|---|---|---|---|
|
Turn the ignition switch to the START position, and check that the battery voltage is applied to the glow plugs.
While cranking the engine, measure the time when the battery voltage is applied to the glow plugs.
| Pre-Heating time | ||||||
|---|---|---|---|---|---|---|
|
INSPECT AFTER GLOW TIME
Remove the glow relay.
After the engine starts, measure the length of time that battery voltage remains present.
| Standard After Glow Time | ||||
|---|---|---|---|---|
|
*1: After glow time changes depending on atmospheric pressure and engine coolant temperature.
Install the glow relay.