INSTALL CHARCOAL CANISTER ASSEMBLY (for LHD)
Install the charcoal canister assembly with the 2 bolts.
Connect the 2 hoses.
INSTALL CHARCOAL CANISTER ASSEMBLY (for RHD)
Install the charcoal canister assembly.
Connect the 2 hoses.
INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Install the air cleaner case with the 3 bolts.
Connect the hose and connector.
INSTALL AIR CLEANER CAP SUB-ASSEMBLY
Install the air cleaner filter element, align the groove on the air cleaner hose with the throttle body alignment tab and tighten the clamp as shown in the illustration.
Tech Tips
A = 30°
B = 11 to 14 mm (0.433 in. to 0.551 in.)
Install the air cleaner cap with the 2 bolts and clips.
Connect the 3 vacuum hoses.
Connect the mass air flow meter connector.
Connect the No. 2 ventilation hose and fuel vapor feed hose assembly.
INSTALL NO. 2 AIR CLEANER INLET
Install the No. 2 air cleaner inlet with the 2 bolts.
Connect the 2 vacuum hoses and harness clamps.
INSTALL COOL AIR INTAKE DUCT SEAL
Install the cool air intake duct seal with the 11 clips.