INSTALL FRONT BLOWER MOTOR SUB-ASSEMBLY
Install the front blower motor sub-assembly with the 3 screws.
Connect the connector.
INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Engage the 2 guides.
Engage the 3 claws and install the No. 2 instrument panel under cover sub-assembly.