INSTALL SKID CONTROL BUZZER
Install the clamp and skid control buzzer.
Connect the skid control buzzer connector.
INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY (for Manual Air Conditioning System)
Connect the hood lock control cable assembly.
Connect each connector.
Engage the 3 claws and 10 clips.
Install the lower instrument panel finish panel sub-assembly with the 2 bolts <B>.
INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY (for Automatic Air Conditioning System)
Connect the hood lock control cable assembly.
Connect each connector and the aspirator duct.
Engage the 3 claws and 10 clips.
Install the lower instrument panel finish panel sub-assembly with the 2 bolts <B>.
INSTALL COWL SIDE TRIM SUB-ASSEMBLY
Engage the claw and clip, install the cowl side trim sub-assembly LH.
Install the clip.
INSTALL FRONT DOOR SCUFF PLATE
Engage the guide and the 8 claws, and install the front door scuff plate LH.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Click here