SKID CONTROL BUZZER INSTALLATION


  1. INSTALL SKID CONTROL BUZZER


    1. A017DT0E01

      Install the clamp and skid control buzzer.

    2. A017FHH

      Connect the skid control buzzer connector.

  2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY (for Manual Air Conditioning System)


    1. A017BY3

      Connect the hood lock control cable assembly.

    2. Connect each connector.

    3. Engage the 3 claws and 10 clips.

    4. Install the lower instrument panel finish panel sub-assembly with the 2 bolts <B>.

  3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY (for Automatic Air Conditioning System)


    1. A017CWD

      Connect the hood lock control cable assembly.

    2. Connect each connector and the aspirator duct.

    3. A017EU2

      Engage the 3 claws and 10 clips.

    4. Install the lower instrument panel finish panel sub-assembly with the 2 bolts <B>.

  4. INSTALL COWL SIDE TRIM SUB-ASSEMBLY


    1. A017G63

      Engage the claw and clip, install the cowl side trim sub-assembly LH.

    2. Install the clip.

  5. INSTALL FRONT DOOR SCUFF PLATE


    1. A017B6P

      Engage the guide and the 8 claws, and install the front door scuff plate LH.

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Click here