BLOWER UNIT INSTALLATION


  1. INSTALL BLOWER UNIT


    1. A01BFB9

      Install the wire harness with the screw. (w/ PTC)

    2. A01BC6ME03

      Install the blower unit with the 4bolts.

    3. Install the 2 clamps and 2 connectors.

    4. Install the 2 connectors. (w/ PTC)

    5. A01BDDF

      Install the junction block with the nut. (body type narrow)

    6. A01BCCT

      Install the junction block with the 2 nuts.(RHD)

  2. INSTALL AIR DUCT NO.2


    1. A01BGCOE01

      Engage the 2 claws to install the air duct No.2.

  3. INSTALL STEERING COLUMN ASSEMBLY

    Click here

  4. INSTALL INSTRUMENT PANEL ASSEMBLY

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  6. PERFORM INITIALIZATION

    Tech Tips

    Some systems need initialization when disconnecting the cable from the negative battery terminal. Click here