VANE PUMP (for 2KD-FTV) INSTALLATION


  1. INSTALL VANE PUMP ASSEMBLY


    1. Install a new vane pump O-ring to the vane pump assembly.

    2. A01BEQHE01

      Install the vane pump assembly with the 2 nuts.

      Torque:
      39 N*m  { 398 kgf*cm, 29 ft.*lbf }

      Note

      Make sure that the vane pump O-ring is not caught between other parts.

  2. CONNECT PRESSURE FEED TUBE ASSEMBLY


    1. Install a new gasket to the pressure feed tube assembly.

    2. A01BBC6E01

      Connect the pressure feed tube assembly to the vane pump assembly with the union bolt.

      Torque:
      50 N*m  { 510 kgf*cm, 37 ft.*lbf }

      Tech Tips

      Make sure the stopper of the pressure feed tube assembly contacts the vane pump assembly as shown in the illustration.

  3. CONNECT OIL RESERVOIR TO PUMP HOSE NO.1


    1. A01BF46E01

      Connect the oil reservoir to pump hose No.1 to the vane pump assembly with the clip.

  4. ADD POWER STEERING FLUID

  5. BLEED POWER STEERING FLUID

    Click here

  6. CHECK FOR POWER STEERING FLUID LEAKS

  7. INSTALL ENGINE UNDER COVER NO.2

  8. INSTALL ENGINE UNDER COVER NO.1