STARTER (for 2.2 kW Type) INSTALLATION


  1. INSTALL STARTER ASSEMBLY


    1. for Automatic Transmission:


      1. Install the starter with the bolt and 2 nuts.

        Torque:
        68 N*m  { 693 kgf*cm, 50 ft.*lbf }
    2. for Manual Transmission:


      1. Install the starter with the bolt and nut.

        Torque:
        68 N*m  { 693 kgf*cm, 50 ft.*lbf }
    3. Connect the wire harness to terminal 30 with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    4. Close the terminal cap.

    5. Connect the terminal 50 connector to the starter.

    6. for Wide Body:

      Install the ground cable with the bolt.

      Torque:
      25 N*m  { 250 kgf*cm, 18 ft.*lbf }
  2. INSTALL NO. 1 TRANSMISSION CONTROL CABLE BRACKET (for Automatic Transmission)


    1. A01BFFD

      Install the No. 1 transmission control cable bracket onto the automatic transmission housing with the 2 bolts.

      Torque:
      28 N*m  { 286 kgf*cm, 21 ft.*lbf }
  3. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY (for Automatic Transmission)


    1. A01BDE0E03

      Secure the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.

    2. Install the transmission control cable assembly onto the control shaft lever with the nut.

      Torque:
      15 N*m  { 150 kgf*cm, 11 ft.*lbf }
  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.