DESCRIPTION
When the engine is being cranked, the intake air flow is slow, so fuel vaporization is poor. A rich mixture is therefore necessary in order to achieve good start ability. While the engine is being cranked, the battery positive voltage is applied to terminal STA of the ECM. The starter signal is mainly used to increase the fuel injection volume for the starting injection control and after-start injection control.
WIRING DIAGRAM
INSPECTION PROCEDURE
Tech Tips
This diagnostic chart is based on the premise that the engine is being cranked under normal conditions. If the engine does not crank, proceed to the problem symptoms table Click here.
PROCEDURE
READ VALUE USING GTS (STARTER SIGNAL)
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Turn the GTS on.
Enter the following menus: Powertrain / Engine and ECT / Data List / Starter Signal.
Read the value.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
INSPECT IGNITION SWITCH Click here |
| OK |
|
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE Click here
INSPECT IGNITION SWITCH
Inspect the ignition switch Click here.
| NG |
|
REPLACE IGNITION SWITCH |
| OK |
|
CHECK HARNESS AND CONNECTOR (IGNITION SWITCH - ECM)
Disconnect the ignition switch connector.
Disconnect the ECM connector.
Remove the ST relay from the instrument panel relay block.
Measure the resistance according to the value(s) in the table below.
| Standard resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPLACE ECM Click here