DIESEL THROTTLE BODY INSTALLATION


  1. INSTALL DIESEL THROTTLE BODY ASSEMBLY

    Note

    After removing and installing, or replacing the throttle body, be sure to perform the operation check.


    1. Install a new gasket to intake air connector.

    2. A01BBJH

      Install the throttle body with the 2 bolts and the 2 nuts.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    3. A01BCMO

      Connect the 2 throttle body connectors.

  2. INSTALL AIR HOSE NO.4


    1. A01BGX6

      Install the air hose No.4 with the 2 clamps.

      Torque:
      6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
  3. INSTALL EGR PIPE SUB-ASSEMBLY NO.1 (w/ EGR Valve)


    1. A01BG49

      Install 2 new gaskets to the cylinder head and the EGR pipe sub-assembly No.1 as shown in the illustration.

    2. A01BD88

      Install the EGR pipe with the 2 bolts and the 2 nuts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    3. A01BGWP

      Connect the fuel pressure sensor connector.

  4. CONNECT OIL RETURN HOSE (w/ Intercooler)


    1. A01BFPG

      Connect the oil return hose with the clip.

  5. INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY


    1. A01BBMI

      Install the vane pump oil reservoir assembly with the 2 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  6. INSTALL ENGINE UNDER COVER NO.1 (w/ Engine Under Cover No.1)

    Torque:
    13 N*m  { 133 kgf*cm, 10 ft.*lbf }