INTEGRATION RELAY INSTALLATION


  1. INSTALL INTEGRATION NO.1 RELAY


    1. Connect the 3 connectors.

    2. Install the integration relay onto the engine room No. 1 junction block.

    3. Install the engine room junction block cover.

  2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  3. PERFORM INITIALIZATION


    1. Perform initialization procedures Click here.

      Note

      Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.