DESCRIPTION
When the ignition switch is turned to ON, the battery voltage is applied to terminal IGSW of the ECM. The MREL output signal from ECM causes a current to flow to the coil, closing the contacts of the MAIN relay and supplying power to terminal +B of the ECM.
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
After replacing the ECM, the new ECM needs registration Click here and initialization Click here.
Inspect the fuses of circuits related to this system before performing the following inspection procedure.
PROCEDURE
INSPECT ECM (+B VOLTAGE)
| *a | Component with harness connected (ECM) |
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND) Click here |
| OK |
|
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE
CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
Disconnect the D70 ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the ECM connector.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT ECM (IGSW VOLTAGE)
| *a | Component with harness connected (ECM) |
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
INSPECT IGNITION SWITCH Click here |
| OK |
|
INSPECT ECM (MREL VOLTAGE)
| *a | Component with harness connected (ECM) |
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPLACE ECM |
| OK |
|
INSPECT NO. 1 INTEGRATION RELAY (MAIN RELAY)
| *1 | Integration Relay |
| *a | Fuse Side |
| *b | Connector Side |
Remove the integration relay from the No. 1 engine room R/B and J/B.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
Reinstall the integration relay.
| NG |
|
REPLACE INTEGRATION NO.1 RELAY (MAIN RELAY) |
| OK |
|
CHECK HARNESS AND CONNECTOR (MAIN RELAY - ECM, MAIN RELAY - BODY GROUND)
Check the harness and connector between the integration relay (MAIN relay) and ECM.
Remove the integration relay (MAIN relay) from the No. 1 engine room R/B and J/B.
Disconnect the B47 ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the ECM connector.
Reinstall the integration relay.
Check the harness and connector between the integration relay (MAIN relay) and body ground.
Remove the integration relay (MAIN relay) from the No. 1 engine room R/B and J/B.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
Reinstall the integration relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (TERMINAL +B OF ECM - MAIN RELAY)
INSPECT IGNITION SWITCH
| *1 | Ignition Switch |
Disconnect the H25 ignition switch connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
Reconnect the ignition switch connector.
| NG |
|
REPLACE IGNITION SWITCH |
| OK |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - IGNITION SWITCH, IGNITION SWITCH - ECM)