DESCRIPTION
When the ignition switch is turned to ON, the battery voltage is applied to terminal IGSW of the ECM. The ECM MREL output signal causes a current to flow to the coil, closing the contacts of the integration relay (MAIN relay) and supplying power to terminal +B of the ECM.
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
INSPECT ECM (+B VOLTAGE)
Turn the ignition switch to the ON position.
Measure the voltage between the terminals of the ECM connectors.
| Voltage | ||||
|---|---|---|---|---|
|
| OK |
|
GO TO PROBLEM SYMPTOMS TABLE |
| NG |
|
CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
Disconnect the negative battery cable.
Disconnect the D1 ECM connector.
Measure the resistance.
| Resistance (Check for open) | ||||
|---|---|---|---|---|
|
Reconnect the ECM connector.
Reconnect the negative battery cable.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT ECM (IGSW VOLTAGE)
Turn the ignition switch to the ON position.
Measure the voltage between the terminals of the ECM connectors.
| Voltage | ||||
|---|---|---|---|---|
|
| OK |
|
INSPECT ECM (MREL VOLTAGE) Click here |
| NG |
|
CHECK AM2 OR IGN FUSE
Check the AM2 fuse.
Remove the AM2 fuse from the engine room R/B No.2.
Measure the AM2 fuse resistance.
| Resistance |
|---|
| Below 1 Ω |
Reinstall the AM2 fuse.
Check the IGN fuse.
Remove the IGN fuse from the instrument panel J/B.
Measure the IGN fuse resistance.
| Resistance |
|---|
| Below 1 Ω |
Reinstall the IGN fuse.
| NG |
|
REPLACE AM2 OR IGN FUSE |
| OK |
|
INSPECT IGNITION SWITCH
Disconnect the I7 ignition switch connector.
Measure the resistance.
| Resistance | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Reconnect the ignition switch connector.
| NG |
|
REPLACE IGNITION SWITCH |
| OK |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - IGNITION SWITCH, IGNITION SWITCH - ECM)
INSPECT ECM (MREL VOLTAGE)
Turn the ignition switch to the ON position.
Measure the voltage between the terminals of the ECM connectors.
| Voltage | ||||
|---|---|---|---|---|
|
| NG |
|
REPLACE ECM |
| OK |
|
CHECK EFI FUSE
Remove the EFI fuse from the engine room R/B No.1.
Measure the EFI fuse resistance.
| Resistance |
|---|
| Below 1 Ω |
Reinstall the EFI fuse.
| NG |
|
REPLACE EFI FUSE |
| OK |
|
INSPECT INTEGRATION NO.1 RELAY (EFI RELAY)
Remove the integration relay from the engine room R/B No.1.
Measure the integration relay (MAIN relay) resistance.
| Resistance | ||||||
|---|---|---|---|---|---|---|
|
Reinstall the integration relay.
| NG |
|
REPLACE INTEGRATION NO.1 RELAY |
| OK |
|
CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - ECM, INTEGRATION RELAY - BODY GROUND)
Check the harness and connector between the integration relay and the ECM.
Remove the Integration relay from the engine room R/B No.1.
Disconnect the B9 ECM connector.
Measure the resistance according to the value(s) in the table below.
| Resistance (Check for open) | ||||
|---|---|---|---|---|
|
| Resistance (Check for short) | ||||
|---|---|---|---|---|
|
Check the harness and connector between the integration relay and the body ground.
Remove the integration relay from the engine room R/B No.1.
Measure the resistance according to the value(s) in the table below.
| Resistance (Check for open) | ||||
|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY - BATTERY POSITIVE TERMINAL)