POWER WINDOW RELAY INSPECTION


  1. INSPECT POWER WINDOW RELAY ASSEMBLY NO.1


    1. A01KIEI

      Check the relay (Marking: P/W) continuity.

      Condition Tester connection Specified Condition
      Constant 1 - 2 Continuity
      Apply B + between terminals 1 and 2 3 - 5 Continuity

      If continuity is not as specified, replace the relay.