INSTALL STARTER TERMINAL KIT
Install new terminal 30 kit parts.
| *1 | Terminal insulator (inside) |
| *2 | Contact plate |
| *3 | Terminal bolt |
| *4 | Packing and terminal insulator (outside) |
| *5 | O-ring |
| *6 | Plate washer |
| *7 | Terminal nut |
| *a | Long |
| *b | Short |
Note
Be careful to install the terminal insulator (inside) in the correct direction.
| *1 | Terminal insulator (inside) |
| *2 | Contact plate |
| *3 | Terminal bolt |
| *4 | Packing and terminal insulator (outside) |
| *5 | Wave washer |
| *6 | Terminal nut |
| *7 | Lead Terminal |
| *a | Long |
| *b | Short |
| *c | Inside |
Temporarily install new terminal C kit parts.
Tech Tips
Be careful to install the terminal insulator (inside) and wave washer in the correct direction.
Put a wooden block on the contact plate and press it down with a hand press.
| *1 | Wooden Block |
| *2 | Contact Plate |
| *a | 20 mm |
| *b | 37 mm |
| *c | 40 mm |
| Dimension of wooden block |
|---|
| 20 x 37 x 40 mm (0.79 x 1.46 x 1.57 in.) |
| Press force |
| 981 N (100 kgf, 221 lbf) |
Note
Check the diameter of the hand press ram. Then calculate the gauge pressure of he press when 981 N (100 kgf, 221 lbf) of force is applied.
If the contact plate is not pressed down with the specified pressure, the contact plate may tilt due to coil deformation or the tightening of the nut.
Using SST, tighten the nuts.
Note
If the nut is over tightened, it may cause cracks on the inside of the insulator.
Clean the contact surfaces of the remaining contact plate and plunger with a dry shop rag.
Install the plunger, a new gasket and the end cover with the 3 bolts.
INSTALL STARTER BEARING (Front)
| *a | Upward |
| *b | Downward |
Using SST and a press, press in a new bearing.
INSTALL STARTER BEARING (Rear)
Using SST and a press, press in a new bearing.
INSTALL STARTER ARMATURE ASSEMBLY
INSTALL STARTER BRUSH HOLDER ASSEMBLY
Place the brush holder on the armature.
Using a screwdriver, install the 4 brushes.
Install the end cover with the 2 screws.
INSTALL MAGNET STARTER SWITCH ASSEMBLY
Apply the high-temperature grease to the steel ball, return spring, 5 clutch rollers and starter idle pinion.
Install the steel ball.
Install the return spring.
Install the starter clutch sub-assembly.
Install the 5 clutch rollers, the retainer and starter idle pinion.
Install the magnet starter switch assembly with the 3 screws.
INSTALL STARTER YOKE ASSEMBLY
Place the felt washer on the armature shaft.
Align the protrusion of the starter yoke assembly with the cutout of the magnet starter switch assembly.
| *1 | Terminal C |
Install the starter yoke assembly with the 2 through bolts.
Connect the terminal C wire with the nut.
Install 2 new dust protectors.