STARTER INSTALLATION


  1. INSTALL STARTER ASSEMBLY


    1. Install the starter assembly with the bolt and nut.

      Torque:
      154 N*m  { 1570 kgf*cm, 114 ft.*lbf }
    2. Connect the starter wire to terminal C with the bolt, and install the terminal cap.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
    3. Connect the starter wire to terminal B with the nut, and install the terminal cap.

      Torque:
      14 N*m  { 138 kgf*cm, 10 ft.*lbf }
    4. Install the wire harness clamp bracket with the bolt.

      Torque:
      18 N*m  { 179 kgf*cm, 13 ft.*lbf }
    5. Connect the 2 wire harness clamps.

  2. INSTALL FLYWHEEL HOUSING STIFFENER PLATE


    1. Install the flywheel housing stiffener plate with the 2 bolts.

      Torque:
      97 N*m  { 989 kgf*cm, 72 ft.*lbf }
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.