ECM INSTALLATION


  1. INSTALL ECM


    1. A01CJGJ

      Install the ECM cover with the 4 screws.

      Note

      Do not use an ECM that has been dropped or received strong impact.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    2. A01CIYG

      Connect the 4 ECM connectors until they are locked.

  2. REGISTER ID CODE

    Click here

  3. CHECK ID CODE

    Click here

  4. INITIALIZE THE LEARNED VALUE OF THE SUPPLY PUMP ASSEMBLY


    1. Perform initialization procedures Click here.

      Note

      Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.