POWER TAKE-OFF CONTROL UNIT INSTALLATION


  1. INSTALL CONTROL UNIT RELAY ASSEMBLY


    1. Install the control unit relay assembly with the 2 nuts.

      Torque:
      31 N*m  { 316 kgf*cm, 23 ft.*lbf }
    2. Connect the connector.

  2. LOWER REAR DECK