INSTALL NO. 2 VOLTAGE CONVERTER BRACKET
Install the No. 2 voltage converter bracket to the voltage converter sub-assembly with the 2 screws.
INSTALL VOLTAGE CONVERTER BRACKET
Install the voltage converter bracket to the voltage converter sub-assembly with the 2 screws.
INSTALL ECU BRACKET
Install the ECU bracket with the 3 bolts.
INSTALL VOLTAGE CONVERTER WITH ECU BRACKET
Install the voltage converter with ECU bracket with the 3 bolts.
Connect the connector.
INSTALL NO. 1 INSTRUMENT PANEL BOX
Attach the 2 wire harness clamps.
Attach the 4 clips, claw and guide to install the No. 1 instrument panel box.
Install the bolt <G>.
INSTALL LOWER INSTRUMENT PANEL
Attach the 8 clips to install the lower instrument panel.
Install the 3 bolts <D>.
Install the clip.
INSTALL LOWER INSTRUMENT COVER
Install the 4 clips to install the lower instrument cover.
INSTALL INSTRUMENT PANEL BOX HOLDER
Install the instrument panel box holder with the 2 screws <E>.
INSTALL INSTRUMENT PANEL BOX ASSEMBLY
Attach the 6 clips to instrument panel box.
INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Connect each connector.
Attach the 13 clips to install the center instrument cluster finish panel sub-assembly.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.