POWER TAKE-OFF SWITCH INSTALLATION


  1. INSTALL POWER TAKE-OFF INDICATOR SWITCH ASSEMBLY


    1. Attach the 2 claws to install the power take-off indicator switch assembly.

  2. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY


    1. Connect each connector.

    2. Attach the 13 clips to install the center instrument cluster finish panel sub-assembly.