COOLER EXPANSION VALVE(except 1ND-TV) INSTALLATION

PROCEDURE


  1. INSTALL COOLER EXPANSION VALVE


    1. Apply sufficient compressor oil to 2 new O-rings and the fitting surfaces of the cooler expansion valve.

      Compressor oil
      ND-OIL8 or equivalent
    2. Install the 2 O-rings onto the cooler evaporator.

    3. Using a 4 mm hexagon wrench, install the cooler expansion valve with the 2 hexagon bolts.

      Torque:
      3.5 N*m  { 36 kgf*cm, 31 in.*lbf }
  2. CONNECT LIQUID TUBE SUB-ASSEMBLY A

    Click here

  3. CONNECT SUCTION TUBE SUB-ASSEMBLY B

    Click here

  4. INSTALL OUTER COWL TOP PANEL (for 1KR-FE)

    Click here

  5. INSTALL INNER COWL TOP TO COWL BRACE (for 1KR-FE)

    Click here

  6. INSTALL FRONT NO. 1 VENTILATOR SEAL (for 1KR-FE)

    Click here

  7. INSTALL FRONT AIR SHUTTER SEAL RH (for 1KR-FE)

    Click here

  8. INSTALL WINDSHIELD WIPER MOTOR AND LINK (for 1KR-FE)

    Click here

  9. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 1NR-FE)

    Click here

  10. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY (for 1NR-FE)

    Click here

  11. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 1NR-FE)

    Click here

  12. INSTALL NO. 1 ENGINE COVER (for 1NR-FE)

    Click here

  13. CHARGE REFRIGERANT

    Click here

  14. WARM UP ENGINE

    Click here

  15. INSPECT FOR REFRIGERANT LEAK

    Click here