DOOR CONTROL RELAY INSTALLATION

PROCEDURE


  1. INSTALL DOUBLE LOCK DOOR CONTROL RELAY ASSEMBLY


    1. Engage the guide.

    2. Install the double lock door control relay with the bolt.

    3. Connect the connector.

  2. INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY (w/ Knee Airbag)

    Tech Tips

    Use the same procedure as for the LHD Click here.

  3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL (w/o Knee Airbag)

    Tech Tips

    Use the same procedure as for the LHD Click here.

  4. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Tech Tips

    Use the same procedure as for the LHD Click here.

  5. INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY

    Click here

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  7. INSPECT SRS WARNING LIGHT

    Click here